Flint Office Group

Swissport Stansted - Flint Office Group

PROJECT

Industrial Fit Out

TIME FRAME

5 Weeks

SIZE

20,000sq ft

Swissport Stansted Project

Swissport appointed us to reconfigure a large operational unit at Stansted Airport, supporting two departments with a single, effective solution. We installed a jumbo partition wall measuring 50 metres long by 10 metres high, creating a clear division to allow both teams to operate independently.

The project also involved the removal of two kiosks and the careful separation of high-level services. We split existing lighting and ambi-rad heating systems to serve each side of the new layout, ensuring safety, compliance, and uninterrupted functionality.

The result is a flexible, well-organised workspace tailored to Swissport’s operational needs – delivered with minimal disruption to the site.

Enhancing the workplace experience

Workspace division with jumbo partitioning wall installation at Stansted Airport for Swissport, including kiosk removal and high-level service separation. Flexible workspace division delivered efficiently.